SINGLE ®
E
C
R
R
U
O
!
T
O
L
S
E
N
E
R
N
N
O
E
A
P
W
P
Y
O
M
N
P
WARNING
M
O
A
O
F
O
C
!
Y
N
R
L
F
A
A
T
V
F
O
C
O
M
E
M
E
T
N
E
R
N
N
O
E
C
R
E
C
A
IS
O
D
F
E
L
B
P
E
R
gal
1 1⁄2
1
gal
1⁄2 gal
READY
SELECTOR
ON
/
WARMER
START
WATER
!
S/N
MANUFACTURED BY BUNN-O-MATIC CORPO
BUN
AMP
WIRE
SPRINGFIELD, ILLINOIS, U.S.A.
MODEL
VOLTS A.C.
PHASE
COVERED UNDER ONE OR MOREOF T
ONE OR M
.
.
.
.
.
.
--
I
WATER
HOT
N
CAUTIO
!
INSTALLATION & OPERATING GUIDE
BUNN-O-MATIC CORPORATION OF CANADA
280 INDUSTRIAL PARKWAY SOUTH,
AURORA, ONTARIO, L4G 3T9.
PHONE: (905) 841-2866 FAX: (905) 841-2775
To ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please visit
the latest catalog and manual updates. Contact Bunn-O-Matic Corporation at 1-800-263-2256 to obtain
a paper copy of the required Illustrated Parts Catalog mailed via Canada Post.
27038.7000H 5/12 ©1996 Bunn-O-Matic Corporation
USER NOTICES
The notices on this brewer should be kept in good condition. Replace unreadable or damaged labels.
WARNING / AVERTISSEMENT
! WARNING
ENERGIZING THE THERMOSTAT.
• DO NOT OVERLOAD CIRCUIT.
• ALWAYS ELECTRICALLY GROUND THE CHASSIS.
• DO NOT DEFORM PLUG OR CORD.
• FOLLOW NATIONAL AND LOCAL ELECTRICAL CODES.
• KEEP COMBUSTIBLES AWAY.
! AVERTISSEMENT
• REMPLIR LE RÉSERVOIR D'EAU AVANT DE BRANCHER
L'APPAREIL OU DE METTRE LE THERMOSTAT SOUS TENSION.
• NE PAS SURCHARGER LE CIRCUIT.
• FILL WATER TANK BEFORE PLUGGING IN UNIT OR
FUNNEL CONTENTS
ARE HOT
JETER LA CARAFE :
DISCARD DECANTER
IF:
• SI ELLE EST FISSURÉE
• SI ELLE EST RAYÉE
• TOUJOURS METTRE LE BOITIER À LA MASSE.
• NE PAS DÉFORMER LA FICHE OU LE CORDON.
• SE CONFORMER AUX CODES NATIONAL OU LOCAL
D'ÉLECTRICITÉ.
• CRACKED
• SI ON A LAISSÉ DE L’EAU
S’ÉVAPORER PAR
• SCRATCHED
• BOILED DRY
ÉBULLITION
• HEATED WHEN EMPTY
USED ON HIGH FLAME
OR EXPOSED ELECTRIC
• GARDER LES PRODUITS COMBUSTIBLES À DISTANCE.
• SI ELLE A ÉTÉ CHAUFFÉE À VIDE
•
TOUT MANQUEMENT À SE CONFORMER À CES DIRECTIVES PEUT
ENTRAINER DES DOMMAGES À L'ÉQUIPEMENT OU PRODUIRE DES
DANGERS D'INCENDIE OU D'ÉLECTROCUTION.
FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE, FIRE OR
•
SI ELLE A ÉTÉ UTILISÉE SUR
UNE FLAMME VIVE OU SUR
DES ÉLÉMENTS ÉLECTRIQUES
SHOCK HAZARD.
LE CONTENU
DE L’ENTONNOIR
EST CHAUD
ELEMENTS
VEUILLEZ LIRE LE MANUEL DE FONCTIONEMENT
EN ENTIER, Y COMPRIS LES LIMITES DE GARANTIES ET
READ THE ENTIRE OPERATING MANUAL INCLUDING
THE LIMIT OF WARRANTY AND LIABILITY BEFORE
BUYING OR USING THIS PRODUCT.
DÉCOUVERTS
RESPONSABILITÉS,AVANT D’ACHETER
OU D'UTILISER LE PRÉSENT PRODUIT.
READ THE ENTIRE OPERATING MANUAL BEFORE USING THIS PRODUCT.
FAILURE TO COMPLY RISKS INJURY.
VEUILLEZ LIRE LE MANUEL D’EMPLOI AVANT D’UTILISER CE PRODUIT.
L’INOBSERVATION DE CES CONSEILS PEUT ENTRAÎNER DES RISQUES DE BLESSURE.
THIS EQUIPMENT IS ENERGIZED AT ALL TIMES UNLESS
L' ÉQUIPEMENT EST TOUJOURS SOUS TENSION
LORSQU'IL N'EST PAS DÉBRANCHÉ.
ELECTRICALLY DISCONNECTED.
00831.0002K 17/11 © 1984 BUNN-O-MATIC CORPORATION
PN: 00658.7000G 02/10 © 1985 BUNN-O-MATIC CORPORATION OF CANADA
00831.0002
00658.7000
WARNING
AVERTISSEMENT
This equipment must be installed to comply with Canadian
Plumbing Codes and applicable health and safety regulations.
For models installed outside Canada, comply with the
applicable Plumbing /Sanitation Code.
To reduce the risk of electric shock, do not remove or
open cover. No user-serviceable parts inside.
Authorized service personnel only. Disconnect power
before servicing.
Cet équipement doit être installé conformément au code
Canadien de plomberie et aux règlements de santé et de
sécurité qui s’ appliquent. Les modèles destinés à être
installés ailleurs qu’au Canada doivent respecter les codes de
plomberie et d’hygiène de la localité.
Afin d’éviter un risque d’électrocution, ne pas ouvrir ou
enlever le panneau. Aucune pièce utile pour
l’opérateur à l’intérieur. Seulement le personnel
autorisé peut effectuer les réparations. Débrancher de la
source de courant avant d’effectuer une réparation.
00656.7001
37881.7000
MAIN ON/OFF
SWITCH
WARNING/AVERTISSEMENT
RETIRER
L’ENTONNOIR
LENTEMENT
REMOVE
FUNNEL
SLOWLY
00824.0002
INTERRUPTEUR
PRINCIPAL
03408.7000
WARNING/AVERTISSEMENT
39803.7000
00824.0001
LIQUIDE
HOT
LIQUID
CHAUD
36302.7000
03409.7002
WARMERS AND
SURFACES ARE HOT
LES RÉCHAUDS ET LES
SURFACES SONT CHAUDES
CAUTION
ATTENTION
12364.7000
Page 3
27038 050412
ELECTRICAL REQUIREMENTS
WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
L2 RED
WHITE
L2 RED
WHITE
L2
N
L2 RED
L2 RED
L2
L1
WHITE
WHITE
N
L1
G
NEUTRAL
L1 BLACK
NEUTRAL
L1 BLACK
L1 BLACK
L1 BLACK
NEUTRAL
L1 BLACK
NEUTRAL
L1 BLACK
L1
G
GREEN
GREEN
GREEN
GREEN
GREEN
GREEN
G
120/208 & 120/240 volt ac models
120 volt ac models
200 and 230 volt ac models
Note: This electrical service consists
of 3 current carrying conductors
(Neutral, L1 and L2) and a separate
conductor for earth ground.
Note: This electrical service consists Note: This electrical service consists
of 2 current carrying conductors
of 2 current carrying conductors
(L1 and L2) and a separate conduc- (L1 and L2) and a separate conduc-
tor for earth ground.
tor for earth ground.
ELECTRICAL HOOK-UP
CAUTION – Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove the front panel beneath the sprayhead.
Models with electronic control assemblies:
Place the tank heater switch at the top of the control assembly in the “OFF” position.
Models with electro/mechanical thermostats:
Rotate the control thermostat knob fully counterclockwise to the “OFF” position.
4. Feed the cord through the strain relief and connect it to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-
place the front panel.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for Initial Set-Up.
PLUMBING REQUIREMENTS
This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138
and 620 kPa) from a 1⁄2" or larger supply line. A shut-off valve should be installed in the line before the brewer.
Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (138 kPa).
The water inlet fitting is 1⁄4" flare.
NOTE – Bunn-O-Matic recommends 1⁄4" copper tubing for installations of less than 25 feet and 3⁄8" for more than 25
feet from the 1⁄2" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer
to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water flow.
This equipment must be installed to comply with the National Plumbing Code of Canada and the Canadian
Food Inspection Agency. For models installed outside Canada, you must comply with the applicable
Plumbing/Sanitation Code for your area.
27038 050412
Page 4
PLUMBING HOOK-UP
NOTE - If a backflow preventer is required by code, a shock arrestor should be installed between
backflow preventer and dispenser. Installing the shock arrestor as close to dispenser as possible will
provide best results.
1. Attach the flare fitting from the short piece of tubing on the strainer/flow control (supplied) to the
water inlet fitting on the bottom of the brewer.
2. Flush the water line and securely attach it to the flare fitting on the strainer/flow control.
3. Turn on the water supply.
INITIAL SET-UP
CAUTION – The brewer must be disconnected from the power source throughout the initial set-up, except when
specified in the instructions.
NOTE: ECA Models Only - This brewer is equipped with a temperature sensor that indicates when to brew and,
when selected, locks out the start of a brew cycle until the water has heated to the optimum brewing tempera-
ture.
1. Remove the front panel beneath the sprayhead.
Models with electronic control assemblies:
Place the tank heater switch at the top of the control assembly in the “OFF” position.
Models with electro/mechanical thermostats:
Rotate the control thermostat knob fully counterclockwise to the “OFF” position.
2. Connect the brewer to the power source. Water will begin flowing into the tank.
3. When water stops flowing into the tank, remove the front panel and proceed as directed:
Models with electronic control assemblies:
Place the tank heater switch at the top of the control assembly in the “ON” position and replace the front
panel.
Models with electro/mechanical thermostats:
Rotate the control thermostat knob fully clockwise to the “ON” position and replace the front panel.
4. Wait approximately twenty-five minutes on 208V,240V Models or fifty minutes on 120V Models for the water
in the tank to heat to the proper temperature.
5. Place an empty server beneath the brew station. Place the Selector switch in the one-gallon position, the
On/OFF switch in the upper position and initiate a brew cycle.
6. Place the On/Off switch in the lower “OFF” position after water has stopped flowing from the funnel, and
check the water volume in the server. It should be 128 ounces.
7. (A) If not, adjust the timer as required. Refer to Adjusting Brew Volumes.
(B) If necessary adjust the needle valve to achieve water volume to be bypassed around the coffee filter in
the funnel.
NOTE: To increase the water bypass turn the needle valve counterclockwise, to decrease the water bypass turn
the needle valve clockwise. An adjustment to the needle valve will require a timer adjustment for volume.
8. Repeat step 7 until the proper water volume is achieved.
9. The brewer is now ready for use in accordance with the coffee brewing instructions.
27038 100407
Page 5
CE REQUIREMENTS
• This appliance must be installed in locations where it can be overseen by trained personnel.
• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C.
• Appliance shall not be tilted more than 10° for safe operation.
• An electrician must provide electrical service as specified in conformance with all local and national codes.
• This appliance must not be cleaned by water jet.
• This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental
capabilities, or lack of experience and knowledge, unless they have been given instructions concerning use of
this appliance by a person responsible for its safety.
• Children should be supervised to ensure they do not play with the appliance.
• If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel with
a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard.
ADJUSTING BREW VOLUMES
CAUTION - Disconnect the power source from the brewer prior to the removal of any panel for the replacement
or adjustment of any component.
NOTE: Prior to setting or modifying batch sizes, check that the brewer is connected to water supply, the tank is
properly filled, and a funnel and server are in place.
1. Modifying batch sizes. To modify a batch volume, first check that the SET/LOCK switch is in the “SET” posi-
tion on the circuit board.
To increase a batch size. Press and hold the START or BREW switch until three clicks are heard. Release
the switch (Failure to release the switch within two seconds after the third click causes the volume setting to
be aborted and previous volume setting will remain in memory) and press it again one or more times. Each
time the switch is pressed, two seconds are added to the brew time period. Allow the brew cycle to finish in
order to verify that the desired volume has been achieved.
To decrease a batch size. Press and release the START or BREW switch once for every two-second interval
to be removed from the total brew time period; then immediately press and hold down the START or BREW
switch until three clicks are heard. Release the switch. (Failure to release the switch within two seconds after
the third click causes the volume setting to be aborted and previous volume setting will remain in memory).
Allow the brew cycle to finish in order to verify that the desired volume has been achieved.
2. Setting batch sizes. To set a batch volume, first check that the SET/LOCK switch is in the “SET” position on
the circuit board. Press and hold the START or BREW switch until three distinct clicks are heard, and then
release the switch. (Failure to release the switch within two seconds after the third click causes the volume
setting to be aborted and previous volume setting will remain in memory). View the level of the liquid being
dispensed. When the desired level is reached, turn the ON/OFF switch to “OFF” (lower). The brewer remembers
this volume and will continue to brew batches of this size until the volume setting procedure is repeated.
NOTE: When brewing coffee, batch volumes will decrease due to absorption by the coffee grounds.
3. Setting programming disable feature. If it becomes necessary to prevent anyone from changing brew times
once programmed, you can set the SET/LOCK switch to the “LOCK” position. This will prevent any program-
ming to be done until switch is once again placed in the “SET” position.
NOTE: If the clicks can not be heard, lightly grip the incoming water line to feel when the valve cycles on
and off.
27038 011110
Page 6
OPERATING CONTROLS
BREW SELECTOR SWITCH
Placing the switch in the 1⁄2 Gal, 1 Gal, or 11⁄2 Gal position selects the amount of coffee to be brewed in sub-
sequent brew cycles. Repositioning this switch after a brew cycle has been initiated does not change the brew
batch in progress.
ON/OFF SWITCH
Placing the switch in the unlighted lower position cuts power to the brew station warmer and stops brew-
ing. Stopping a brew cycle after it has been started will not stop the flow of water from the funnel. Placing the
switch in the lighted upper position supplies power to the brew station warmer and enables the brew circuit.
START SWITCH
Momentarily pressing and releasing this switch starts a brew cycle when the On/Off switch is in the lighted
upper position.
NOTE – The On/Off switch must be in the lighted upper position to initiate and complete a brew cycle.
COFFEE BREWING
1. Select the desired batch size.
2. Insert a BUNN filter into the funnel.
3. Pour the proper amount of fresh coffee into the filter and level the bed of grounds by gently shaking.
4. Slide the funnel into the funnel rails.
5. Place an empty server under the funnel.
6 Place the On/Off switch in the lighted upper position. Momentarily press and release the start switch.
7. When brewing is completed, simply discard the grounds and filter.
CLEANING
1. The use of a damp cloth rinsed in any mild, non-abrasive, liquid detergent is recommended for cleaning all
surfaces on Bunn-O-Matic equipment.
2. Check and clean the sprayhead. The sprayhead holes must always remain open.
NOTE – In hard water areas, this may need to be done daily. It will help prevent liming problems in the brewer
and takes less than a minute.
27038 091900
Page 7
|