Instruction Sheet Number 1101FIC
Page ꢀ of 2
Installation Procedure for High Wattage Insulated Ceiling
Frame-In Kits ꢀ00IFIC, ꢀꢀ0ꢀFIC, 200ꢀFIC
Read and understand these instructions before installing fixture.
This fixture is intended for installation in accordance with the National Electrical Code and local regulations. To assure full compliance with local codes and
regulations, check with your local electrical inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
New Construction
NOTE: I.C. Frame-In Kit may be used in direct contact with insulation.
Fig. B
Wire-In
Fig. C
Swing-Up
Fig. D
Close-In
Fig. E
Snap-On
Fig. F
Push-Up
Fig. A
Frame-In
Warning: Use Only With Lightolier Reflector Trims Marked With I.C. Lamping Information.
Use of Other Manufacturers’ Trims Voids the Underwriters Laboratories Listing and Could Constitute A Fire Hazard
1. FRAME-IN (Fig. A)
Locate fixture along joist and line up bottom edge of HINGEd MOUNTING BAR
BENd AT HOLE
TAB
with the bottom of joist and fasten in place.
5 3/4" 200ꢀFR
5 ꢀ/4" ꢀ004ICX
5 5/8" ꢀꢀ0ꢀFIC
BENd AT TAB
CENTER LINE OF
APERTURE OPENING
5 7/8" 200ꢀFIC
For suspended ceilings:
•
•
Rotate HINGEd BAR ENdS to position shown and fully extend bars.
Crimp bottom of edge of CHANNEL to prevent rotation of
HINGEd BAR ENdS.
6 3/8" ꢀ00ꢀFIC
6"
ꢀꢀ0ꢀFIC
•
•
•
Bend NON-HINGEd end of mounting bar at featured hole location and
extend out.
Position notched area of MOUNTING BARS onto T-BAR and lock by
bending TAB underneath T-BAR BEAd as shown.
For suspended ceiling, make certain that bottom of Mounting Frame is no
higher than ꢀ" above ceiling line.
Note: Integral nail version available
HINGEd MOUNTING BAR
T-BAR
HINGEd BAR ENdS
CHANNEL
TAB
For Joist Spacing Less Than 16" On Center (To 12" On Center):
•
MOUNTING BAR CHANNELS can be shortened and used as nailing
legs in tight spaces. Simply remove INNER BAR from holed CHANNEL,
bend CHANNEL at appropriate point and use extra screw to secure it
to the joist. (Fig. G)
Fig. G
Lightolier a Genlyte company
63ꢀ Airport Road, Fall River, MA 02720 • (508) 679-8ꢀ3ꢀ • Fax (508) 674-47ꢀ0
We reserve the right to change details of design, materials and finish.
© 2007 Genlyte Group LLC • B0607
|